PlanetTogether + ScheduleIQ · For Medical Device Manufacturers

Medical device schedules leave no room for guesswork.

Validated resources, inspection steps, tooling constraints, skilled labor, sterilization windows, material availability, and strict customer commitments make medical device scheduling a finite-capacity problem from the start.

Finite-capacity APS · Validated resources · Quality holds · Traceable execution
Medical Device Dispatch Synced from APS
Laser Cell 02 Validated resource
WO 46128 · LATE RISK Implant Component · Lot 2407
1:40p
WO 46136 · QC HOLD Instrument Body · Lot 2410
3:10p
Cleanroom Assembly On track
WO 46098 Device Assembly · Qty 180
12:45p
WO 46105 Final Pack · Qty 220
2:30p
24jobs today
4at risk
2quality holds

Medical device scheduling challenges

Every job has constraints. Some of them are validated.

Medical device plants rarely struggle because demand is unknown. They struggle because the path from demand to shipment includes qualified equipment, skilled operators, inspection, documentation, tooling, sterilization, and controlled process steps.

01

Validated resources

Only specific machines, tools, processes, or combinations may be approved for a product or operation.

02

Quality holds

Inspection, release, testing, documentation, and approval time can sit directly on the critical path to shipment.

03

Shared tooling & labor

Skilled technicians, molds, fixtures, gauges, cleanroom capacity, and support resources can constrain multiple jobs at once.

04

Long multi-step routings

Machining, cleaning, inspection, outside processing, assembly, sterilization, and packaging must stay synchronized.

Why medical device schedules break

A due date is easy to promise. A validated path to that date is harder.

Traditional ERP and MRP systems can calculate requirements, but they do not always resolve the resource, timing, and sequencing conflicts that determine whether the order can actually move through production on time.

Not every machine is interchangeable

A qualified process route may only allow certain equipment, tools, operators, or work centers. Infinite-capacity plans miss that immediately.

Inspection time is still lead time

QC queues, first-piece approvals, testing, and final release consume calendar time even when the production equipment is idle.

One late operation cascades downstream

When a machining or inspection step slips, assembly, sterilization, packaging, and final shipment can all move with it.

PlanetTogether plans it

Build a finite-capacity plan your medical device operation can actually execute.

PlanetTogether models the real manufacturing rules behind the schedule so planners can see feasible dates, bottlenecks, and tradeoffs before making a commitment.

01

Validated resource constraints

Restrict operations to qualified machines, work centers, tooling, and approved alternate resources instead of assuming capacity is interchangeable.

02

Multi-resource scheduling

Coordinate machine time with skilled labor, fixtures, gauges, cleanroom space, and other supporting resources required to run the job.

03

Hold, dwell & inspection time

Model waiting periods, QC holds, inspection queues, sterilization windows, outside processing, and other non-machine time that affects the true completion date.

04

Material-aware planning

Prevent schedules from starting work that cannot finish because a component, subassembly, purchased material, or outside-process supply is unavailable.

05

What-if before you commit

Test a rush order, new priority, machine outage, added shift, delayed component, or capacity change against the current plan before promising a date.

ScheduleIQ runs it

Put the approved schedule where supervisors can actually use it.

ScheduleIQ takes the live APS schedule and turns it into an execution view for the floor, helping supervisors see what is next, what is slipping, and which jobs need attention now.

01

Every operation in sequence

Open a machine, cell, cleanroom, or work center and see the active queue, scheduled start, due date, lot information, and live status.

02

AI flags late risk

Surface jobs whose slack is disappearing, resources that are overloaded, and orders whose current execution path puts the promised date at risk.

03

Plain-English schedule assistant

Ask which orders are late, what is blocking a work center, where capacity is tight, or which jobs need attention without building a custom report.

04

Log live production status

Mark jobs started, in setup, waiting on inspection, blocked, or complete so the dispatch board reflects the actual floor.

05

React without rebuilding the master plan

Adjust the day's execution sequence around the reality of the shift while PlanetTogether remains the planning system of record.

Why Scheduling Solutions

Medical device APS requires more than installing software.

The value comes from modeling the operation correctly: qualified resources, routings, inspection, material constraints, setup logic, labor, and the business rules that determine a feasible schedule.

Deep APS implementation experience

We configure PlanetTogether around real manufacturing constraints instead of forcing the plant into a generic scheduling model.

ERP & systems integration

Connect orders, routings, materials, inventory, resources, and status from QAD, SAP, Dynamics, Oracle, Epicor, Infor, and other systems.

Custom logic when standard isn't enough

Add scheduling rules, alerts, dashboards, workflow extensions, and integrations for requirements unique to your medical device process.

Planner-focused deployment

Build a schedule planners can understand, trust, maintain, and explain when priorities or production conditions change.

Execution visibility

Extend APS to the floor with ScheduleIQ so supervisors are working from the latest sequence instead of a stale spreadsheet or printout.

Continuous improvement

After go-live, keep refining constraints, rules, KPIs, and workflow as products, resources, and customer requirements evolve.

See it in your operation

Bring us your hardest medical device scheduling week.

Show us the validated resources, quality holds, tooling constraints, long routings, and customer commitments that make your current schedule difficult. We’ll show you how PlanetTogether can plan it—and how ScheduleIQ can help the floor run it.

Free Assessment

Book Your Free Scheduling Assessment

Start Your Journey to Becoming World Class